Deploy a static site's build output to Cloudflare Pages with wrangler (installed as a dev dependency, run through bunx), covering production deploys from the default branch, preview deploys for pull requests, and headers and redirects config.
Category: deploy
In your existing repository
Ask your agent to check compatibility, follow this fragment’s brief, and verify the resulting project. What happens next
- Applies to:
- astro-blog
Add to your project
Paste the prompt into the coding agent working on your project.
View prompt
Or use the terminal
npx @steamfield/stacks add cloudflare-pages| Step | Phase | Layer | Command |
|---|
No additional verify steps declared. Run the project’s existing verification after applying the brief.
Use with a new stack
Starting fresh instead? These stacks support this fragment.
- astro-blogoptional
npx @steamfield/stacks new astro-blog --with cloudflare-pages
Files
This fragment supplies instructions rather than project files.
Usage
Among stacks projects in the 28 days through 30 Oct 2026: 435 projects; 69% reached a green verify (64–74%, n=275).
Weekly projects by stack
Projects whose final fragment set included this fragment, grouped by stack.
- astro-blog
- astro-blog
Stacks projects per UTC week through 30 Oct 2026. Published stack counts only.
Data table
| Week ending | Stack | Projects |
|---|---|---|
| 5 Jul 2026 | astro-blog | 20 |
| 12 Jul 2026 | astro-blog | 30 |
| 19 Jul 2026 | astro-blog | 50 |
| 26 Jul 2026 | astro-blog | 70 |
| 2 Aug 2026 | astro-blog | 50 |
| 9 Aug 2026 | astro-blog | 55 |
| 16 Aug 2026 | astro-blog | 90 |
| 23 Aug 2026 | astro-blog | 60 |
| 30 Aug 2026 | astro-blog | 85 |
| 6 Sept 2026 | astro-blog | 85 |
| 13 Sept 2026 | astro-blog | 80 |
| 20 Sept 2026 | astro-blog | 115 |
| 27 Sept 2026 | astro-blog | 120 |
| 4 Oct 2026 | astro-blog | 95 |
| 11 Oct 2026 | astro-blog | 115 |
| 18 Oct 2026 | astro-blog | 115 |
| 25 Oct 2026 | astro-blog | 115 |
By stack
How often this fragment stays in a default composition, or gets attached as an option.
Stacks projects · 28 days through 30 Oct 2026. Counts rounded to 5.
Data table
| Stack | Projects | Role | Share |
|---|---|---|---|
| astro-blog | 435 | Optional · attached | 17% |
Green rate with and without it
This compares projects; it isn't an effect of the fragment.
With
69%64–74%, n=275
Without
69%67–72%, n=1,355
Stacks projects · 28 days through 30 Oct 2026. Counts rounded to 5.
Data table
| Stack | With | Without |
|---|---|---|
| astro-blog | 69% (64–74%, n=275) | 69% (67–72%, n=1,355) |
Often used with
Co-occurrence above the baseline, within a stack. Required fragment pairs are excluded.
Not enough runs in this breakdown yet.
Stacks projects · 28 days through 30 Oct 2026. Counts rounded to 5.
Computed 31 Oct 2026, through 30 Oct 2026. Numbers describe stacks projects, not the ecosystem.